WAEC Syllabus for Block Laying, Brick Laying And Concrete Works. WAEC Syllabus for Block Laying, Brick Laying And Concrete Works is available for all candidates who want to participate in the examination. The West African examination council (WAEC) has officially introduced a syllabus that will guide all the WAEC candidates who wish to write the WAEC examination this year. For a very successful Block Laying, Brick Laying And Concrete Works examination for this year, you need to check out the available areas of concentration. It has been divided into sections with chapters, followed by the topics to be covered in preparation for the exams. In the WAEC Block Laying, Brick Laying And Concrete Work syllabus, you will also see the format of how the WAEC Block Laying, Brick Laying And Concrete Work questions will be presented. Jamb form 

There are always 3 sections to answer questions from. Paper 1 is objective, paper 2 contains essay questions and paper 3 is practical’s. Where paper one (1) carries 45 minutes for 40 marks; paper two (2) carries 1 hour for 60 marks while paper three (3) carries 3 hours duration for 100 marks.

WAEC Syllabus for Block Laying, Brick Laying And Concrete Works

This WAEC syllabus is for both the O’level WAEC and General Certificate Examination (GCE) candidates. Final year students in the senior secondary school level and external candidates are eligible to make use of this syllabus and prepare ahead of the examination.

See the full detailed information concerning the WAEC Block Laying, Brick Laying And Concrete Works Syllabus below.

EXAMINATION SCHEME

 

There will be three papers, Papers 1, 2 and 3 all of which must be taken.Papers 1 and 2 shall be a composite paper to be taken at one sitting in 1 hour 45 minutes for 100 marks.

Paper 1:           will consist of forty multiple-choice objective questions all of which are to be answered in 45 minutes for 40 arks.

Paper 2:           will consist of five short-structured questions.  Candidates will be required to answer any four in 1 hour for 60 marks.

Paper 3            will be a practical test of 3 hours duration for 100 marks.  It will be a work

piece involving laying of a total number of blocks not exceeding 30 and where the work piece is made of bricks only, the total number of bricks shall not exceed 100.

Where the work piece to be laid is a combination of bricks and blocks, this will not contain more than 20 blocks and 40 bricks. (i.e. in composite walling).

A list of materials for the test shall be made available to schools not less than two weeks before the paper is taken for material procurement and relevant preparations.

Alternative to Practical Test

Alternatively, in the event that materials for the actual practical test cannot be acquired, the Council may consider testing theoretically, candidates’ level of acquisition of the practical skills prescribed in the syllabus.  For this alternative test, there will be two compulsory questions to be answered in 3 hours for 100 marks.

DETAILED SYLLABUS

 

S/NO. CONTENT NOTES
1. Workshop and site safety (i)                  Various safety rules at work site.

(ii)                First aids.

(iii)               Purpose of safety.

(iv)              Safety regulations (scaffolding, electrical, installations, etc)

(v)               Protective wears.

2 Basic tools and equipment (i)                  Identification of basic hand tools for blocklaying, bricklaying and concreting including site preparation and levelling tools, finishing tools.

(ii)                Sketching of basic hand tools.

(iii)               Uses of basic hand tools and equipment.

(iv)              Simple maintenance of basic tools and equipment.

3 Site preparations and setting –  out (i)                  Tools and equipment used for site preparation.

(ii)                Clearing of building site.

(iii)               Methods of setting out.

(iv)              Setting out tools and materials.

4. Manufacture, application and properties of blocks and bricks. (i)                   Manufacturing processes of blocks and bricks.

(ii)                Types of bricks and blocks

(iii)               Materials used for blocks and bricks (sand, lime, cement, clay, laterite and water).

5. Concreting materials (i)                  Various constituents of concrete

(ii)                Cement – Types of cement

(iii)               Definition of Fine and coarse aggregates and their differences.

(iv)              Storage of concrete materials.

6 Formwork for construction work. (i)                  Functions and functional requirements of formwork.

(ii)                Materials used for formwork.

(iii)               Advantages of steel and timber formworks.

(iv)              Construction of formworks for concrete floor slabs, beams, columns, arches lintels and staircase.

(v)               Erection and striking of formworks.

 

S/NO. CONTENT NOTES
7 Concreting operations (i)                  Mix proportions. (Cement – aggregate ratio; water-cement ratio).

(ii)                Stages in concreting (Batching, mixing, transporting, placing, curing).

(iii)               Methods of transporting wet concrete.

(iv)              Testing of concrete.

(v)               Properties of concrete.

(vi)              Methods of making construction joints in concrete elements.  (Beams, columns, concrete roofs and slab).

(vii)            Need for concrete reinforcement.

(viii)           Methods of reinforcing concrete elements

(ix)              Types of steel reinforcement bars.

(x)               Casting and curing of concrete structures (in-situ and precast concrete).

8 Basic principles of substructure construction work including ground floors (i)                  Types of soil.

(ii)                Definitions of site and soil investigation.

(iii)               Definitions of bearing capacity of soil.

(iv)              Definition of foundation, types and uses.

(v)               Definitions of ground floors, types, uses and construction.

(vi)              Materials for d.p.c. and d.p.m.

(vii)            Differences between d.p.c. and d.p.m.

(viii)           Methods of placing and positioning d.p.c. in  walls.

9 Upper floors (i)                  Functions and types of floors.

(ii)                Methods of floor construction.

(iii)      Types of flooring and their applications.

 

10 Walls (i)                  Functions and types of walls.

(ii)                Walling materials.

(iii)               Common bonds in brick/block walls.

(iv)              Mortar (types, mixing methods and ratios).

(v)               Differences between pointing and jointing.

(vi)              Types of pointing and jointing.

 

 

 

 

 

 

S/NO. CONTENT NOTES
11 Openings in walls. (i)                  Functions and types of openings.

(ii)                Materials used for lintels, beams, and arches

(iii)               Windows and doors

– functions and types of windows and doors.

– materials for windows and doors.

– methods of fixing.

(iv)     Ironmongery for doors and windows.

12 Stairs construction (i)                  Types of stair.

(ii)                Construction of a straight flight stair.

13 Scaffold and scaffolding (i)                  Types of scaffolds.

(ii)                Scaffold components.

(iii)               Hoisting equipment.

(iv)              Safety regulation.

14 Finishes (i)                  Types of finishes.

(ii)                Types of finishing materials.

(iii)               Characteristics of finishing materials.

(iv)              Uses of finishing materials

(v)               Care and maintenance of finishes.

15 Construction of drainage system. (i)                  Principles of good drainage system.

(ii)                Types of a drainage system.

(iii)               Differences between a sewer and a drain.

(iv)              Simple sketches of septic-tank; soakaway pit, inspection chamber, manhole and cesspool.

(v)               Surface drainage.

(vi)              Method of laying drain pipes to a specified gradient.

16 Kerbs (i)                  Functions and types of kerbs.

(ii)                Materials used in production of kerbs.

(iii)               Methods of laying precast concrete kerbs.

17 Business opportunities in Building (i)                  Opportunities in building industry.

(ii)                Procedures for establishing businesses in the industry.

(iii)               Requirements for managing construction business

(iv)              Estimating the cost of construction jobs.

(v)               Principles and techniques of Book-keeping.

 

 

 

 

LIST OF TOOLS AND EQUIPMENT

 

TOOLS                                                                       EQUIPMENT

  1. Internal angle trowel 1.         A complete set of scaffolding,                                                                                fittings and scaffolding pipes
  2. External angle trowels 2.         Block moulding machines
  3. Pointing trowel 3.         Buckets
  4. Hand trowel 4.         Concrete mixer
  5. Block axe 5.         Concrete vibrator (Poker and

clamp-on)

  1. Boat level 6.         Gauge box
  2. Bolster 7.         Manual hand mould
  3. Club hammer 8.         Hand rammer
  4. Builders square 9.         Hand sieves (various sizes)
  5. Brick hammer 10.       Headpan
  6. Cold chisel 11.       Levelling instrument
  7. Corner blocks 12.       Measuring tape
  8. Folding rule 13.       Pick axe
  9. Gauge rod or rule 14.       Slump test apparatus.
  10. Hawk 15.       Tyrolean machine
  11. Joint duster 16.       Water hoses and roses
  12. Jointers                                     17.       Wheelbarrow.
  13. Jointing board/caulking board 18.       Terrazzo grinding machine
  14. Line and pin
  15. Mason’s hand saw
  16. Metal float
  17. Plastering trowel
  18. Plumb rule and bob
  19. Builder’s line
  20. Spade
  21. Shovel
  22. Claw hammer
  23. Gauge lath
  24. Pointing tools
  25. Pointing trowel
  26. Range.
  27. Spirit level.
  28. Steel square
  29. Straight edge
  30. Skutch
  31. Square and bevel
  32. Tingle plate
  33. Wire brush
  34. Wooden float.

 

 

 SUGGESTED READING LIST

 

S/NO. TITLE OF BOOK AUTHOR PUBLISHER
1 Barry’s introduction to construction of Buildings Stephen Emmett and Christopher A Gorse Blackwell Publishing.
2 Building Technology Ivor H. Seeley Palgrave
3 Building Construction,

Volumes 1 – 4

Mckay Longman
4 Principles of construction Roger Greeno.
5 Advanced Building Construction Volumes 1 & 2 C. M. H. Baritt. Longman
6 Construction Technology Volumes 1 – 4 R. Chudley. Longman
7 Building Construction for Senior Secondary Schools. Volumes 1 – 3 L. A. Adesokan and M. O. Adeniyi. Ilesanmi
8 Blocklaying and concreting Industrial Crafts Series M. O. Obande Longman
9 Brickwork Volume 1 – 3 W. G. Nash

Check and Confirm: How much is Dollar to Naira

 

InfoGuide Nigeria is a team of Resource Persons and Consultants led by Ifiokobong Ibanga. Page maintained by Ifiokobong Ibanga. If you need a personal assistance on this topic, kindly contact us.

Related Posts

ATBU Postgraduate Application Deadline Extended 2024/2025

ATBU Postgraduate Application Deadline Extended 2024/2025

The Sale of ATBU PGD, Master, and Ph.D. Online Application forms, for the 2024/2025 academic session have been extended from 7th August, to 7th September, 2024. The New…

IAUE Post-UTME/DE Application Deadline Extended 2024/2025

This is to inform all UTME/Direct Entry candidates that Ignatius Ajuru University of Education has extended the deadline for the 2024/2025 Post-UTME/Direct Entry Registration Exercise which commenced on…

OAUSTECH Admission List 2024/2025 is Out on School’s portal

OAUSTECH Admission List 2024/2025 is Out on School’s portal

OAUSTECH Admission List 2023/2024 is Out on School’s portal. Candidates who applied for admission into various courses and programmes of the Olusegun Agagu University of Science and Technology…

IAUE Post UTME Admission Screening Procedures and Guidelines 2024/2025

IAUE Post UTME Admission Screening Procedures and Guidelines 2024/2025. This is to inform all candidates seeking admission into Ignatius Ajuru University Of Education that the management has released…

Fed Poly Nasarawa Resumption Date 2024/2025

Fed Poly Nasarawa Resumption Date 2024/2025

Fed Poly Nasarawa Resumption Date 2024/2025 – The Fed Polytechnic Nasarawa has approved Monday, 2nd September, 2024 as the resumption date for the 2024/ 2025 Academic Session. To…

UNILAG HRDC Application form 2024/2025 [Advanced Diploma, Diploma & Professional Certificate courses]

UNILAG HRDC Application form 2024/2025 [Advanced Diploma, Diploma & Professional Certificate courses]

UNILAG HRDC Application form 2024/2025. The management of the University of Lagos wishes to enlighten the public and all interested candidates to enroll in this year’s admission exercise…

Leave a Reply

Your email address will not be published. Required fields are marked *